2 a) Draw a neat sketch of Hauled Container System.
b) Municipal solid waste from the Al-Khuwair area is to becollected in hauled containers in conjunction with stationarycompactors. It is estimated that the average time to drive fromgarage to the first container location (t1) and from the lastcontainer F/QAP/021/001 2 location to the garage (t2) each day willbe 20 min and 25 min respectively. If the average time required todrive between the containers is 3 min and the one-way distance tothe Al Amerat is 20 km (speed limit: 72 km/h). Determine the numberof containers that can be emptied per day, based on an 8-h workday.Assume the offroute factor W is equal to 0.12.