(4 pts) Define the term of “windrow†in grader operations. Howcan you minimize spillage from the blade?
(3 pts) In what soils is a vibratory pile driver/hammereffective?
(7 pts) List major factors that should be considered when layingout a construction site.
List 4 functions that required to process and produce suitableaggregate materials