4. Using the graphic and information below, answer the following questions. ...
60.1K
Verified Solution
Link Copied!
Question
Accounting
4. Using the graphic and information below, answer the following questions.
Product X which is produced by Patriot Inc., which has a Fabrication Department and Assembly Department. They produce in a batch size of 20. NOTE that only Fabrication has set-up times. Fabrication produces three parts needed for Product X: a batch of Part 1 is made by Machine A and then transported to Machine B, a batch of Part 2 is made by Machine C, and a batch of Part 3 is made by Machine D. A batch containing all three parts are completed by Fabrication and then sent to the WIP queue in front of Assembly.
In Assembly, the transfer batch size is 1 kit (one each of Part 1 , Part 2, and Part 3). Assembly 1 attaches all three parts to create an initial Product X. Assembly 2 completes all other assembly actions. Assembly operates as a paced line with no queues between the assembly workers. Assume an 8-hour workday. Only one batch is allowed in each department at one time.
4a. Calculate the BPT for each of the three parts in the Fabrication Department. Which part is the bottleneck?
4b. If only one batch is allowed in each department at a time, how long would a batch of 20 take to process through Assembly?
4c. What is the minimum MTT for a batch of Product X?
4d. What is the capacity of this entire process in batches per day (assuming an 8 hour day)?
Answer & Explanation
Solved by verified expert
Get Answers to Unlimited Questions
Join us to gain access to millions of questions and expert answers. Enjoy exclusive benefits tailored just for you!
Membership Benefits:
Unlimited Question Access with detailed Answers
Zin AI - 3 Million Words
10 Dall-E 3 Images
20 Plot Generations
Conversation with Dialogue Memory
No Ads, Ever!
Access to Our Best AI Platform: Flex AI - Your personal assistant for all your inquiries!