A highway being designed to AASHTO guidelines with a 70 mphdesign speed, and at one section, an equal tangent vertical curvemust be designed to connect grades of +1% and -2%. If the gradesintersect at station 100+00, determine the stationing of the PVC,PVT and curve high point for the minimum curve length based pn SSDrequirements.