A low-rise is being planned and your company provided the mostadvantageous bid to the owner, as a contractor in the design buildpartnership you have been tasked to begin working with the designteam on all electrical components of the structure. Develop a listof all of the required electrical systems in the structure, assumethis is a high hazard structure. Include in your check list anyitems that would require long lead times, special considerations(location, etc.), and any possible input from the owner, the listneeds to be extensive in nature such that the design team can beginconcept design from your list.