An operator walks from her workstation to a set ofshelves 10 steps away. She picks up both a hammer (weighs 2.5pounds) and a box of nails from the shelf(s), which are at kneelevel. She must reach 10 inches into the shelf to grasp the hammer.Following the retrieval of the hammer she much reaches 10 inchesinto an adjacent shelf to grasp a box of nails. She returns to herworkstation and sets the hammer and nails down on the work surface(waist height).
Develop a MOST sequence model to describe this workactivity. Calculate the estimated standard time (in seconds) forthis activity
Motion and time study for lean manufacturing