Answer by stating either “True†or “False†in the space belowand provide the correct statement/answer if “Falseâ€.
11)F.L. in levelling means; Formation level.
12)C.P. written in remarks column on a survey field note means;Change Point.
13)In scaling, the scale 1:200 cm mean, that for each 1 cm onplan equals 2 metres in real time.
14)Hight of collimation method to calculate reduce levels isused often to cover larger areas.
15)When volume is calculated, bulking of 30% is added to thetotal calculation if sand was the type of soil.