Assessment 5.0: Hand back process Produce a report (min 300words) to detail the hand back process as defined by theinfrastructure controller and detail the factors that should beconsidered as part of the hand back process including the potentialareas for special consideration which should be confirmed. Detailthe requirements for construction records which form part of thehand back process. The assets will be handed-back to the procuringauthority at contract expiration. It is good practice to establishminimum criteria to be met by the assets so as to ensure that theseare transferred back to the procuring authority in an acceptablecondition.