Bluecap Co. uses a standard cost system and flexible budgets for control purposes. The following...
90.2K
Verified Solution
Link Copied!
Question
Accounting
Bluecap Co. uses a standard cost system and flexible budgets for control purposes. The following budgeted information pertains to 2019: Denominator volume-number of units Denominator volume-percent of capacity Denominator volume-standard direct labor hours (DLHS) Budgeted variable factory overhead cost at denominator volume Total standard factory overhead rate per DLH 7,000 90% 21,000 $ 103,700 $ 15.10 During 2019, Bluecap worked 26,000 DLHs and manufactured 9,100 units. The actual factory overhead cost for the year was $13,000 greater than the flexible budget amount for the units produced, of which $5,000 was due to fixed factory overhead. In preparing a budget for 2020 Bluecap decided to raise the level of operation to 90% of capacity (a level it considers to be "practical capacity"), to manufacture 8,500 units at a budgeted total of 25,500 DLHS. The total overhead variance in 2019 for Bluecap Co., to the nearest whole dollar, was: (Round your intermediate calculation to 2 decimal places.) Multiple Choice $13,000 unfavorable. $28,208 favorable. $30,448 favorable. $51,008 favorable. $51,008 unfavorable
Answer & Explanation
Solved by verified expert
Get Answers to Unlimited Questions
Join us to gain access to millions of questions and expert answers. Enjoy exclusive benefits tailored just for you!
Membership Benefits:
Unlimited Question Access with detailed Answers
Zin AI - 3 Million Words
10 Dall-E 3 Images
20 Plot Generations
Conversation with Dialogue Memory
No Ads, Ever!
Access to Our Best AI Platform: Flex AI - Your personal assistant for all your inquiries!