Desilets Corporation has provided the following data from itsactivity-based costing accounting system: Supervisory wages $85,600 Factory utilities $ 306,000 Distribution of ResourceConsumption across Activity Cost Pools: Activity Cost Pools BatchSet-Ups Unit Processing Other Total Supervisory wages 60 % 37 % 3 %100 % Factory utilities 29 % 63 % 8 % 100 % The "Other" activitycost pool consists of the costs of idle capacity andorganization-sustaining costs that are not assigned to products.Required: a. Determine the total amount of supervisory wages andfactory utilities costs that would be allocated to the UnitProcessing activity cost pool. b. Determine the total amount ofsupervisory wages and factory utilities costs that would NOT beassigned to products. Determine the total amount of supervisorywages and factory utilities costs that would NOT be assigned toproducts. Unassigned Costs Supervisory wages Factory utilities