Determine the value of X in the below table.
Item: A Safety Stock = 200
Description: Eiger Backpack Lot-Size = LFL Lead Time = 2 weeks
Period
37
38
39
40
41
42
43
44
Gross Requirements
1500
1400
1250
Scheduled Receipts
0
1700
On Hand
3600
Net Requirements
Planned Order Receipts
Planned Order Releases
X