During and after the commissioning and turn-over process, the
design and construction team need to provide...
60.1K
Verified Solution
Link Copied!
Question
Civil Engineering
During and after the commissioning and turn-over process, thedesign and construction team need to provide the owner with manyimportant documents for the operation of the building. Theseinclude all of the following, except:
A list of things that the contractor secretly left out of thebuilding to save costs.
Operations and maintenance manuals for installed equipment
Final construction drawings, typically called \"As Built\"drawings. These incorporate any minor changes made duringconstruction.
Design calculations for building systems.
Warranty, test-and-balance, and inspection documents.
Building Information Modeling (BIM) data, if included in thecontract.
Samples and inventories of spare parts and materials used in theconstruction, to facilitate repairs.
Answer & Explanation
Solved by verified expert
3.8 Ratings (697 Votes)
Explanation Project commissioning is the process of assuring that all systems and components of a building or industrial plant are designed installed tested operated and maintained according to the operational requirements of the owner or final client Construction team submit documents regarding equipment cutsheets schematics inprogress record drawings manufacturers
See Answer
Get Answers to Unlimited Questions
Join us to gain access to millions of questions and expert answers. Enjoy exclusive benefits tailored just for you!
Membership Benefits:
Unlimited Question Access with detailed Answers
Zin AI - 3 Million Words
10 Dall-E 3 Images
20 Plot Generations
Conversation with Dialogue Memory
No Ads, Ever!
Access to Our Best AI Platform: Flex AI - Your personal assistant for all your inquiries!