Flexible Budgets and Standard Cost Systems
Using Excel to prepare a flexible budget performance report
Pilchuck Company manufactures tote bags and has provided the following information for September :
Use the blue shaded areas on the ENTERANSWERS tab for inputs.
Prepare a flexible budget performance report, including the heading. Use the ABS function when calculating variances, and use the dropdown selections for F or U when describing the variances. Note: start with calculating the budget amounts, then calculate variances and choose appropriate descriptions of the variances. For variances with a zero amount, make sure to include the result of in the appropriate cell and leave the dropdown to identify the variance as elther F or U blank.
Always use cell references and formulas where appropriate to receive full credit. If you copypaste from the Instructions tab you will be marked wrong.
Cell Hint:
C:C D:D J:J Use cell references to the values in the data table provided at the top of the Instructions worksheet for calculations. E:E H:H D Use the function ABS to calculate the variances.
F:F I: Do not choose the descriptions and leave cells blank if corresponding variances equal zero.