Hayden, Inc. produces two different products, Product A and Product B. Hayden uses a traditional...
90.2K
Verified Solution
Link Copied!
Question
Accounting
Hayden, Inc. produces two different products, Product A and Product B. Hayden uses a traditional volume-based costing system in which direct labor hours are the allocation base. Hayden is considering switching to an ABC system by splitting its manufacturing overhead cost across three activities: Engineering, Manufacturing, and Inspection. The cost of each activity and usage of the activity drivers are as follows:
Cost
Usage by Product A
Usage by Product B
Engineering (Engineering Hours)
$
900,000
4,000
6,000
Manufacturing (Direct Labor Hours)
$
1,080,000
450,000
450,000
Inspection (Batches)
$
600,000
6,000
4,000
Hayden manufactures 14,350 units of Product A and 7,175 units of Product B per month. Required: a. Calculate the predetermined overhead rate under the traditional costing system. (Round your answer to 2 decimal places.)
b. Calculate the activity rate for Engineering. (Round your answer to 2 decimal places.)
c. Calculate the activity rate for Manufacturing. (Round your answer to 2 decimal places.)
d. Calculate the activity rate for Inspection.
e. Calculate the indirect manufacturing costs assigned to each unit of Product A under the traditional costing system. (Do not round intermediate calculations. Round your answer to 2 decimal places.)f. Calculate the indirect manufacturing costs assigned to each unit of Product B under the traditional costing system. (Do not round intermediate calculations. Round your answer to 2 decimal places.)
g. Calculate the indirect manufacturing costs assigned to each unit of Product A under the ABC system. (Do not round intermediate calculations. Round your answer to 2 decimal places.)
h. Calculate the indirect manufacturing costs assigned to each unit of Product B under the ABC system. (Do not round intermediate calculations. Round your answer to 2 decimal places.)
i. Which product is under-costed and which is over-costed under the volume-based cost system compared to ABC?
Answer & Explanation
Solved by verified expert
Get Answers to Unlimited Questions
Join us to gain access to millions of questions and expert answers. Enjoy exclusive benefits tailored just for you!
Membership Benefits:
Unlimited Question Access with detailed Answers
Zin AI - 3 Million Words
10 Dall-E 3 Images
20 Plot Generations
Conversation with Dialogue Memory
No Ads, Ever!
Access to Our Best AI Platform: Flex AI - Your personal assistant for all your inquiries!