If you could show work it would be greatly appreciated also, if possible use the...
70.2K
Verified Solution
Link Copied!
Question
Accounting
If you could show work it would be greatly appreciated also, if possible use the template that I have provided. Thank you, also this is all the question provides me with.
SallyMay, Inc., designs and manufactures T-shirts. It sells its T-shirts to brand name clothes retailers in lots of one dozen. SallyMay's May 2013 static budget and actual results for direct inputs are as follows:
Static Budget Number of T-shirt lots (1 lot1 dozen) 400
Per Lot of T-shirts: Direct materials 14 meters at $1.70 per meter$23.80 Direct manufacturing labor 1.6 hours at $8.10 per hour $12.96
Actual Results Number of T-shirt lots sold 450
Total Direct Inputs: Direct materials 6,840 meters at $1.95 per meter = $13,338 Direct manufacturing labor 675 hours at $8.20 per hour = $5,535
SallyMay has a policy of analyzing all input variances when they add up to more than 10% of the total cost of materials and labor in the flexible budget, and this is true in May 2013. The production manager discusses the sources of the variances: "A new type of material was purchased in May. This led to faster cutting and sewing, but the workers used more material than usual as they learned to work with it. For now, the standards are fine."
Calculate the direct materials and direct manufacturing labor price and efficiency variances in May 2013. What is the total flexible-budget variance for both inputs (direct materials and direct manufacturing labor) combined? What percentage is this variance of the total cost of direct materials and direct manufacturing labor in the flexible budget?
Sally King, the CEO, is concerned about the input variances. But she likes the quality and feel of the new material and agrees to use it for one more year. In May 2014, SallyMay again produces 450 lots of T-shirts. Relative to May 2013, 2% less direct material is used, direct material price is down 5%, and 2% less direct manufacturing labor is used. Labor price has remained the same as in May 2013. Calculate the direct materials and direct manufacturing labor price and efficiency variances in May 2014. What is the total flexible-budget variance for both inputs (direct materials and direct manufacturing labor) combined? What percentage is this variance of the total cost of direct materials and direct manufacturing labor in the flexible budget?
Comment on the May 2014 results. Would you continue the "experiment" of using the new material?
4-variance analysis, fill in the blanks.
Variable
U/F
Fixed
U/F
1. Spending variance
2. Efficiency variance
3. Production-volume variance
4. Flexible-budget variance
5. Underallocated (overallocated) MOH
You can use the worksheet below to calculate the variances for the above table
Flexible Budget:
Allocated:
Budgeted Input Qty.
Budgeted Input Qty.
Allowed for
Allowed for
Actual Costs
Actual Input Qty.
Actual Output
Actual Output
Incurred
Budgeted Rate
Budgeted Rate
Budgeted Rate
Variable Manufacturing Overhead
Spending variance
Efficiency Variance
Never a Variance
Flexible-budget variance
Never a Variance
Overallocated Variable Overhead
Flexible Budget:
Same Budgeted
Same Budgeted
Allocated:
Lump Sum
Lump Sum
Budgeted Input Qty.
(as in Static Budget)
(as in Static Budget)
Allowed for
Regardless of
Regardless of
Actual Output
Actual Costs Incurred
Output Level
Output Level
Budgeted Rate
Fixed Manufacturing Overhead
Spending variance
Never a Variance
Production volume Variance
Flexible-budget variance
Production volume Variance
Underallocated fixed Overhead
Answer & Explanation
Solved by verified expert
Get Answers to Unlimited Questions
Join us to gain access to millions of questions and expert answers. Enjoy exclusive benefits tailored just for you!
Membership Benefits:
Unlimited Question Access with detailed Answers
Zin AI - 3 Million Words
10 Dall-E 3 Images
20 Plot Generations
Conversation with Dialogue Memory
No Ads, Ever!
Access to Our Best AI Platform: Flex AI - Your personal assistant for all your inquiries!