In batching of aggregates the moisture content is expected to bein saturated surface dry condition. However, in a concreteproduction, the actual moisture content of coarse aggregate on thesite just before the batching measured as 8%, and its saturatedsurface dry condition requires 5% moisture content. If1000kg/m3 of coarse aggregate and 220kg/m3 offree water is needed for a concrete production, how many kg ofcoarse aggregate and water is to be placed into the mixer for onem3 of concrete production?