Q1. We have a controller, and every time the Operator changesthe Set Point, the controller responds, and gets the process sortedout. Now, somewhere, we have read that load disturbances needed tobe considered in processes, as well. How will this controllerreact, if there is a load disturbance, and not a Set Pointchange?                                                                                                                     Â
Q3. The Process Variable jumps around, quite a bit. Which of thePID settings should we not be using, to improve controllability,and extend the life of our Final Control Element?                                                                                                                                                          Â