Q3: A hydro- power station has reserve capacity 25 % from maximum load of total...
50.1K
Verified Solution
Link Copied!
Question
Finance
Q3: A hydro- power station has reserve capacity 25 % from maximum load of total power station and delivers the loads with daily loads curves shown below: (15 Marks) 9-12 12-17 17-18 18-19 Time in hours Region A in kW Time in hours Region B in kW Midnight -9 600 midnight - 8 500 4000 8-13 3000 800 13-14 3000 14-17 19-midnight 2000 19- midnight 800 17-19 800 1000 Draw the daily load curve of total power station and 1- Find a- Plant use factor, load factor and diversity factor of total power station. b- The amount of water in one day if the head and plant efficiency are 50 m and 80%. 2- Suggest operation schedule for the machines selected from suitable generator units from the 1, 2, and 3 MVA. Q3: A hydro- power station has reserve capacity 25 % from maximum load of total power station and delivers the loads with daily loads curves shown below: (15 Marks) 9-12 12-17 17-18 18-19 Time in hours Region A in kW Time in hours Region B in kW Midnight -9 600 midnight - 8 500 4000 8-13 3000 800 13-14 3000 14-17 19-midnight 2000 19- midnight 800 17-19 800 1000 Draw the daily load curve of total power station and 1- Find a- Plant use factor, load factor and diversity factor of total power station. b- The amount of water in one day if the head and plant efficiency are 50 m and 80%. 2- Suggest operation schedule for the machines selected from suitable generator units from the 1, 2, and 3 MVA
Answer & Explanation
Solved by verified expert
Get Answers to Unlimited Questions
Join us to gain access to millions of questions and expert answers. Enjoy exclusive benefits tailored just for you!
Membership Benefits:
Unlimited Question Access with detailed Answers
Zin AI - 3 Million Words
10 Dall-E 3 Images
20 Plot Generations
Conversation with Dialogue Memory
No Ads, Ever!
Access to Our Best AI Platform: Flex AI - Your personal assistant for all your inquiries!