Suppose the Luxury boat requires 5,250 machine hours, 192 inspections, and 102 batches. Using activity...
80.2K
Verified Solution
Link Copied!
Question
Accounting
Suppose the Luxury boat requires 5,250 machine hours, 192 inspections, and 102 batches. Using activity proportions, determine the amount of overhead assigned to the Luxury product line.
M4-10 to M4-12 Lakeside Inc. manufactures four lines of remote control boats and uses activity-based costing to calculate product cost. Activity Cost Pools Machining Setup Quality control Estimated Total Cost $659,400 103,785 161,280 Estimated Cost Driver 21,000 machine hours 510 batches 960 inspections M4-12 (Algo) Assigning Costs Using Activity Proportions (LO 4-5] Suppose the Luxury boat requires 5,250 machine hours, 192 inspections, and 102 batches. Using activity proportions, determi amount of overhead assigned to the Luxury product line. (Round your final answers to the nearest whole number.) Answer is complete but not entirely correct. Cost Pool Allocated Overhead 164,850 Machining $ Setup Costs $ 39,072 X Quality Control $ 17,136 X Total Overhead $ 217,863
Answer & Explanation
Solved by verified expert
Get Answers to Unlimited Questions
Join us to gain access to millions of questions and expert answers. Enjoy exclusive benefits tailored just for you!
Membership Benefits:
Unlimited Question Access with detailed Answers
Zin AI - 3 Million Words
10 Dall-E 3 Images
20 Plot Generations
Conversation with Dialogue Memory
No Ads, Ever!
Access to Our Best AI Platform: Flex AI - Your personal assistant for all your inquiries!