50.1K
Verified Solution
Link Copied!
The predetermined overhead rate by using direct labor costs as the allocation base = 0.75
The predetermined overhead rate by using machine hours as the allocation base = 32
Which allocation bases is preferred and why?
Answer & Explanation
Solved by verified expert