The single plantwide factory overhead rate is calculated as follows:
Actual Overhead Cost/Actual Allocation Base
Actual Overhead Cost/Budgeted Allocation Base
Total Budgeted Factory Overhead Costs/Total Budgeted Allocation Base
Total Budgeted Factory Overhead/Actual Factory Overhead
Which of the following cannot be used for external financial reporting since it does not include all manufacturing costs?
Single plantwide factory overhead rate
Activity-Based Costing
Multiple production Department Factory Overhead Rates
Which of the following can be used to improve the cost of a product by identifying activities with cost improvement opportunities?
Activity Based Costing
Multiple production department factory overhead rate