70.2K
Verified Solution
Link Copied!
Which of the following should an auditor do when control risk is assessed at the maximum level?
Multiple Choice
A. Document the control structure more extensively.
B. Perform fewer substantive tests of details.
C. Document the assessment.
D. Perform more tests of controls.
Answer & Explanation
Solved by verified expert